Our New House
Feb 2002 - Location & Plans ] Feb 20/02 - Interior Design ] March 21/02 - Ground Breaking ] April 2/02 - Foundations day 1 ] April 3/02 - Foundations day 2 ] April 4/02 - Foundations day 3 ] April 5/02 - Concrete Poured ] April 7/02 - Forms Removed ] April 8/02 - Water Connections ] April 9/02 - Drain tiles ] April 10/02 - Drains & Electrical ] April 11/02 - Foundation Filled with Sand ] April 12/02 - Interior Plumbing ] April 15/02 - Ready for Slab ] April 17/02 - Slab is poured ] April 23/02 - 1st Floor Walls ] April 24/02 - Stairs to the 2nd Floor ] April 25/02 - 2nd Floor Walls ] April 27/02 - More Framing ] April 29/02 - Rafters & Front Porch ] April 30/02 - Lower Roof ] May 1/02 - Start of Upper Roof ] May 2/02 - Roof & Windows ] May 3/02 - Front Yard + more ] May 6/02 - Roof Shingles ] May 7/02 - Lower Shingles + ] May 9/02 - Plumbing + Doors ] May 15/02 - Siding & more ] May 16/02 - Insulation ] May 17/02 - Deck & Electrical ] May 21/02 - Drywall and Siding ] May 22/02 - Siding done & Garage Door ] May 24/02 - Drywall Taping and Cedar Siding ] May 29/02 - Gas Meter and Textured Ceilings ] May 30/02 - Driveway Forms & House Number ] June 3/02 - Painting and Baseboards ] June 4/02 - Driveway, Tiles, Cabinets... ] June 5/02 - Cabinets, Counters and Lights ] June 6/02 - Lights and Other Electrical ] June 14/02 - 2 weeks left ] June 17/02 - Exterior Paint and Friends ] June 18-24/02 - Less than a week left!! ] July 3/02 - Grass!! ]

 

Return
 

 Copyright© 2002, Alex Wadsworth. All rights reserved.